1600-degree horizontal hydrogen furnace


ItemSpecification
Main useHorizontal hydrogen furnace for decarburising anneal, brazing and reduction sintering of Kovar and similar alloys; composed of furnace body, gas system, wet-H₂ unit, water-cooling system and vacuum system.
Hot zone (L×W×H)350 mm × 350 mm × 1000 mm
Max. furnace temperature≥ 1600 °C
Working temperature≥ 1550 °C
Temperature uniformity≤ ±5 °C (no load, 1000 °C, 30 min dwell)
Temperature stability±1 °C; PID auto-tuning
Control mode20+ programmable curves, ≥20 segments each
Ultimate vacuum≤ −0.09 MPa (gauge)
Safety interlocksAudio / visual alarms for low water/gas pressure, heating anomaly and H₂ explosion-proof devices
Process atmosphereN₂ + H₂ with humidity control
HumidifierWater temperature controllable
ThermocouplesControl: W-Re 526; monitor: K-type
Pump-down time≤ (factory value) min
Leak rate≤ 0.5 Pa h⁻¹
Max. heating rate≥ 20 °C min⁻¹
H₂ pressure0.02 – 0.4 MPa
N₂ pressure0.02 – 0.05 MPa
Power supply3-phase 380 V / 220 V 50 Hz, 100 kW
Cooling water≤15 °C (summer), 0.2–0.4 MPa, inlet 1½ in.
Overall dimensions3 m L × 3 m W × 2.2 m H
Net weight2200 kg
Main mechanical parts
  • Door: head weldment with sight glass, 8-layer radiation shield (4 Mo + 4 SS), water-cooled flange.
  • Furnace shell: double-wall 304 SS with water jackets, 3-zone ring-type Mo-band heaters, 8-layer cylindrical shield (4 Mo + 4 SS).
  • Gas system: 304 SS piping, valves, pressure sensors.
  • H₂ system: dual SS lines, rotameters, burn-off valve, anti-flashback device, safety valve, auto-igniter.
Electrical & control
  • Cabinet: PLC + 10-inch HMI, C36 Azbil controller, thyristor voltage regulator, transformer, voltage / current meters.
  • Password “123321” required for parameter changes.
  • Alarms: over-temp, low cooling flow, pump overloads, regulator fault, low gas pressure; predictive warning before shut-down.
  • Manual mode: 0–100 % power output available on HMI.
Key components list (abbrev.)
表格
复制
ItemQtyMaker
Furnace body1Chengdu Xin Nan Guang (in-house)
Vacuum system1 setidem
Direct-drive pump BSV301dedicated supplier
Control cabinet1idem
Transformers3dedicated
C36 controller3Azbil (Japan)
Power regulator3dedicated
Spare-parts package
6 K-type TCs, 2 seal kits, 2 ceramic insulators, 1 tool set, 30 m power cable, 12 Mo heating elements, 1 Mo loading plate.
Installation notes
Unpack, check list, place on level foundation, reconnect removed parts, leak-check vacuum & gas lines, wire control cabinet, earth ground.
Maintenance & safety
  • Room must be ventilated, free of open flame and flammables; H₂ detector required if air-conditioned.
  • Check water/gas tightness and electrical connections periodically.
  • Keep furnace under vacuum during stand-by; change pump oil regularly.
  • Use 99.99 % pure process gases; do not exceed rated temperature.